Stadium Renovation Plans Announced


chknwing

Recommended Posts

BdY6DQKCYAEr9tU.png

There will be four new bays installed at three entry gates with extra wide escalators in each bay.

 

BdY6jc2CAAAwtWu.png

Two new ribbon boards (approximately 5 feet high) will encircle the entire bowl at club level and upper bowl level.

 

BdY67U_CUAAPTfc.png

Two new 63' high x 212' long high-definition video boards will be located above each end zone.

 

BdY7uifCAAAALGB.png

Bank of America Stadium will also feature new illuminated glass domes on each of the three entry gates.

 

A new high-efficiency, high-octave distributed sound system will also be installed throughout the bowl.

 

Team President Danny Morrison says construction on Bank of America Stadium is scheduled to begin two weeks from today

 

These renovations are phase one of three. The Panthers plan on making renovations over the next three years during each

offseason.

 

The team hired Turner Construction for the 2014 renovations, which are scheduled to be finished July 1.

 

The Panthers plan to build four new escalator bays to bring fans to the upper bowl faster. The escalators can carry 6,000 people an hour, the team said.

 

On top of the escalator bays will be four new “party plazas.” These spaces will allow fans in the upper bowl to congregate, watch games on TVs and have views of the city and uptown skyscrapers.

 

The team will also install flagpoles on the top of the upper bowl that will double as new speakers to improve the stadium sound system.

 

Update.  Heres a video

http://www.panthers.com/media-vault/videos/Bank-of-America-Stadium-Enhancements/f91b2fb3-d268-4e65-a5d3-696d38b3cf09

 

 

 

Unfortuantely I see nothing about the horrible buzzing sound from the lights in the upper deck or the lack of drainage system to deal with the swimming pool effect in the lower deck when it rains. Or some kind of rest room modification to put more urinals in the bathroom.  Cmon, They can do rows or something to add more, 1 wall of urinals per bathroom doesnt cut it.

Link to comment
Share on other sites

You can see at the stadium where they've started doing the preliminary work for the escalators.  My question is it looks like they end up outside, so do they have a gate before you get on the people movers?  That's gonna be interesting.  I was under the impression they were going to be set up to use after you get inside the concourses.  

Link to comment
Share on other sites

Anybody know what the size of the current video boards is?

 it will be atleast twice as big.

 

Current Video Boards Etc

 

End Zone Displays

Located in each end of the stadium between the 300 and 400 levels are displays and advertising panels that include:

  • One 5' x 9' delay-of-game clock
  • Two 5' x 6' internally illuminated logo panels
  • Two 5' x 15 internally illuminated advertising panels

Located in each end of the stadium above the 500 level seating area are displays and advertising panels that include:

  • One 31.5' x 77' Mitsubishi DiamondVision LED display (shows live action, replays, video features, game information, statistics, game prompts and advertising messages)
  • Three 24' x 32' advertising panels
  • One 24' x 32' Tri-Vision three-sided advertising panel
  • Two 9' x 12' advertising panels
  • One 12' x 76' advertising panel
  • Four line array speaker clusters at the top of the west end scoreboard only

Sideline Displays

Located on each sideline between the 300 and 400 levels are displays and advertising panels that include:

  • One 5' x 300' Daktronics ProAd LED display (shows game-in-progress statistics and information, game prompts, out-of-town scores and advertising messages)
  • Four 5' x 15' internally illuminated advertising panels

Corner Displays

Located in the northwest and southeast corners of the stadium between the 300 and 400 levels is a display that includes:

  • One 5' x 73' Daktronics ProAd LED display (shows game clock, game score, game-in-progress information and advertising messages)
Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.


  • PMH4OWPW7JD2TDGWZKTOYL2T3E.jpg

  • Topics

  • Posts

    • Would absolutely love to have him. I dont think he would require more than a 5th rounder. The biggest thing with his contract is the amount of guaranteed money. As long as they can work out and scenario where the Panthers aren't on the hook for a lot of that, I think it's a no-brainer. The Panthers can come up with $20M at the drop of a hat with restructuring Moton's contract, so there definitely isn't an issue from a money perspective. Jaycee paired with Ramsey along with Mike Jack would give us one of the best CB groups in the league. The one caveat I see is that safety still remains our biggest current weakness. We need a starting caliber S more than CB, simply put. But adding someone like Ramsey would be amazing as long as the compensation made sense. Ramsey could also play for FS snaps also. I also dont understand this nonsense about being seasons away. We have a QB on a rookie deal who was playing at an elite level to end last season. Within reason, now is absolutely the time to make moves like trading for Ramsey.
    • He'd be a huge upgrade for this year, but we're still not going to be contenders with him and I'd rather keep the cap space to roll into next season to spend on a younger player who can be an impact starter for us for the next 3-5 years while we're hoping to contend.
    • Because playoff hockey and regular season hockey aren’t the same thing.  It’s a combination of the game intensity being dialed up with loose officiating.
×
×
  • Create New...